Skip to content

Commercial HVAC in Rabat

Installation and maintenance of centralised HVAC systems for hotels, offices, retail and facilities.

Same-day quote
Service warranty
Firm price before any work
Emergencies 7 days a week
We service all major brands with OEM parts, without compromising the manufacturer warranty. · Qualified & certified technicians

Common problems

  • Some indoor units no longer cool
  • Outdoor unit cutting out
  • Abnormal noises in the ducts
  • Elevated electricity consumption
  • Leaks along the pipework
  • Big temperature gap between floors or zones
  • Recurring error code on the BMS

Frequently asked questions

Any other question? Send us a message on WhatsApp.

How do I book the best Commercial HVAC service in Rabat?
To book the best Commercial HVAC service in Rabat, message us on WhatsApp with the appliance brand, model, any displayed error code, and a clear photo. You get a written same-day quote for requests sent before noon, then an intervention slot. Work is covered by a written parts-and-labour warranty. Office hours: Monday to Saturday 08:00–21:00, Sunday for emergencies.
What's the difference between VRV/VRF and a chiller?
VRV/VRF works with direct refrigerant between units (no water). Best for hotels and offices up to 5000 m². A chiller produces chilled water distributed through the building — best for very large projects (hospitals, malls). The choice depends on floor area, budget and architecture.
How often should a hotel VRF be serviced?
Minimum: quarterly (4 visits/year) for indoor units, twice a year for the outdoor unit (before summer, before winter). Filters cleaned monthly. Outdoor condenser washed at least twice a year (more often in dusty environments like Ouarzazate).
Can we add units to an existing VRF?
Yes — provided the outdoor unit has spare capacity (we check this against the system report). If the outdoor unit is maxed out, we add a second unit in parallel. A prior thermal study is essential.
How long does a mid-size hotel VRF install take?
30-50 room hotel: 3 to 6 weeks depending on how tricky the copper routing is and building-shell progress. 100+ room project: 2 to 4 months. We coordinate with other trades to avoid delays.
Can the system be controlled remotely?
Yes — modern systems (Daikin Cloud, BACnet, Modbus) allow supervision and control via a mobile app or web platform. Useful for multi-site hotels or facility managers. We roll out updates and connect your equipment.
What energy savings can I expect from a modern system?
Gap between an old fleet (R22, >10 years, no Inverter) and a modern Inverter VRF with BMS: 25-40% savings. Payback in 4-6 years depending on usage intensity. Free energy audit on serious projects.
Do you offer a contract with emergency response?
Yes — hotel/clinic contract: quarterly visits, emergency priority 7 days a week, written reports and preferential parts pricing. See the preventive maintenance page for full details.
Who handles the electrical and building work?
We cover: mechanical and refrigeration install, electrical connection from the dedicated breaker, and testing. Structural work (openings, heavy supports, main-power cable pulls) is done by the electrician or builder. We coordinate with them.
Fast response

Have a technical issue? Let's talk now.

A technician can respond immediately on WhatsApp.

Sengo Service Maroc

Professional refrigeration, air-conditioning and appliance services across Morocco

Al Massira district, Marrakech, MoroccoOffice: Monday to Saturday — 08:00 to 21:00 · Sunday: closed (technicians on call for emergencies)Fast 7-day emergency response, including Sunday
WhatsAppCall